Risk assessment analysis in the installation and operation of electrical infrastructure of onshore and offshore wind farms

 
Το τεκμήριο παρέχεται από τον φορέα :

Αποθετήριο :
Αποθετήριο ΔΙ.ΠΑ.Ε.
δείτε την πρωτότυπη σελίδα τεκμηρίου
στον ιστότοπο του αποθετηρίου του φορέα για περισσότερες πληροφορίες και για να δείτε όλα τα ψηφιακά αρχεία του τεκμηρίου*
κοινοποιήστε το τεκμήριο




2016 (EL)

Risk assessment analysis in the installation and operation of electrical infrastructure of onshore and offshore wind farms

Bais, Michail

12 Thesis Overview The purpose of the Master Thesis is to answer to th e following research questions: i) Which are the main differences between onshore and offshore wind farms. ii) Which are the most important steps in construction process of wind farms. iii) What kind of specifications must be followed in the design of electrical infrastructure of wind farm. iv) What kind of protection systems must be installed i n the electrical infrastructure of wind farms. v) Which are the most important risks in the installat ion and operation of electrical infrastructure of wind farms. The first chapter a technical analysis of wind farm s is made and the differences between onshore and offshore wind farms are analyzed. Speci fically, all the infrastructures and their differences between each type of wind farm are desc ribed. In addition, the differences in the investment and operation cost as well as in mai ntenance and wind resource are described. In the second chapter, the construction schedule of the two types of wind farms is analyzed and recommendations are made for the reduction of t he construction period of the plants. In the third chapter, the standards and the specifi cations that must be followed in the selection of equipment and the installation of subs tations and secondary systems for each type of wind farm are described. In the fourth chapter, the type of cables in wind f arms and the standards with which they must comply are described. In the fifth chapter, a risk analysis is made durin g the installation and operation of cables, substation and secondary systems of wind farms. In the sixth chapter, the conclusions of the risk a nalysis for hazardous events in electrical infrastructure installation and operation are descr ibed.

masterThesis

Wind power plants--Environmental aspects
Wind power--Technological innovations
Wind turbines--Economic aspects
Wind turbines
Wind power
Wind power industry
Wind power plants--Design and construction
Wind turbines--Environmental aspects


Αγγλική γλώσσα

2016-02-11T01:00:17Z
2016-02-10T08:34:36Z
2016-02-10


ihu
International Hellenic University




*Η εύρυθμη και αδιάλειπτη λειτουργία των διαδικτυακών διευθύνσεων των συλλογών (ψηφιακό αρχείο, καρτέλα τεκμηρίου στο αποθετήριο) είναι αποκλειστική ευθύνη των αντίστοιχων Φορέων περιεχομένου.