Preparation and hydration study of alinite cement

 
δείτε την πρωτότυπη σελίδα τεκμηρίου
στον ιστότοπο του αποθετηρίου του φορέα για περισσότερες πληροφορίες και για να δείτε όλα τα ψηφιακά αρχεία του τεκμηρίου*
κοινοποιήστε το τεκμήριο




1991 (EL)

Preparation and hydration study of alinite cement (EN)

Philippou, Th (EN)
Ftikos, Ch (EN)
Georgiades, A (EN)

A laboratory alinite clinker was prepared at 1200-degrees-C by using industrial raw materials and adding 2.6% CaCl2 to the raw mix. The structure of the clinker was studied by XRD and SEM. Three cements were prepared by intergrinding the clinker with 4, 6 and 8% gypsum. Compressive Strength development of these cements was studied up to 90 days. Hydration phenomena were also studied by XRD and SEM in pastes cured for 7, 28, and 90 days. Useful information is drawn concerning the structure of alinite clinker and the hydration phenomena of these cements. (EN)

journalArticle (EN)

Alinite (EN)
Clinker (EN)
Concrete Aggregates--Performance (EN)
Construction & Building Technology (EN)
Materials Science, Multidisciplinary (EN)
Cement (EN)
Concrete--Mechanical Properties (EN)
Chloroaluminates (EN)


Cement and Concrete Research (EN)

Αγγλική γλώσσα

1991 (EN)

1129 (EN)
1136 (EN)
ISI:A1991GM90400019 (EN)
6 (EN)
0008-8846 (EN)
10.1016/0008-8846(91)90073-Q (EN)
21 (EN)

PERGAMON-ELSEVIER SCIENCE LTD (EN)




*Η εύρυθμη και αδιάλειπτη λειτουργία των διαδικτυακών διευθύνσεων των συλλογών (ψηφιακό αρχείο, καρτέλα τεκμηρίου στο αποθετήριο) είναι αποκλειστική ευθύνη των αντίστοιχων Φορέων περιεχομένου.