A new integrated system for selecting mining equipment

 
see the original item page
in the repository's web site and access all digital files if the item*
share




1998 (EN)

A new integrated system for selecting mining equipment (EN)

Xerocostas, D (EN)
Michiotis, A (EN)
Galitis, N (EN)

In this paper the problem of selecting main excavating equipment in open pit lignite mines is approached through mathematical programming. The approach, which mainly refers to the preliminary scheduling of the exploitation, is based on the exploitation of an extended horizontal stratification lignite deposit and on the use of the ""German equipment method"". © 1998 Published by Elsevier Science Ltd. All rights reserved. (EN)

journalArticle (EN)

Excavators (EN)
Computer Science, Interdisciplinary Applications (EN)
Mathematical Programming (EN)
Scheduling (EN)
Open pit mining (EN)
Lignite (EN)
Integrable System (EN)
Decision theory (EN)
Problem solving (EN)
German equipment method (EN)
Stratification (EN)
Engineering, Industrial (EN)
Risk management (EN)
Mathematical programming (EN)


Computers and Industrial Engineering (EN)

English

1998 (EN)

34 (EN)
397 (EN)
10.1016/S0360-8352(97)00164-2 (EN)
0360-8352 (EN)
ISI:000073473700010 (EN)
2-4 (EN)
391 (EN)

PERGAMON-ELSEVIER SCIENCE LTD (EN)




*Institutions are responsible for keeping their URLs functional (digital file, item page in repository site)