Preparing Phase 4 of the n_TOF/CERN facility

see the original item page
in the repository's web site and access all digital files if the item*



Preparing Phase 4 of the n_TOF/CERN facility (EN)

Garcia Infantes, Francisco
Stamati, Maria-Elisso
Spelta, Michele
Amaducci, Simone
Praena Rodriguez, Antonio Javier
Bacak, Michael
Casanovas Hoste, Adria
Manna, Alice
Pavon Rodriguez, Jose Antonio
Patronis, Nikolas
Mengoni, Alberto

info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion

2022-10-17


After CERN’s Long Shutdown 2, the n_TOF facility infrastructure was largely upgraded. The biggest change is the installation of a new lead spallation target, the performance of which needs to be carefully examined. During Summer 2021, the facility’s two flight paths were characterised in terms of neutron beam energy distribution, profile and resolution. In this work, the characterisation of the facility is described and the first results are given. (EN)


n_TOF (EN)
CERN (EN)

Annual Symposium of the Hellenic Nuclear Physics Society

English

Hellenic Nuclear Physics Society (HNPS) (EN)


2654-0088
2654-007X
Annual Symposium of the Hellenic Nuclear Physics Society; Τόμ. 28 (2021); 109-111 (EL)
HNPS Advances in Nuclear Physics; Vol. 28 (2021): HNPS2021; 109-111 (EN)

Πνευματική ιδιοκτησία (c) 2022 Maria-Elisso Stamati, Nikolas Patronis, Michael Bacak, Simone Amaducci, Adria Casanovas Hoste, Francisco Garcia Infantes, Alice Manna, Alberto Mengoni, Jose Antonio Pavon Rodriguez, Antonio Javier Praena Rodriguez, Michele Spelta (EL)
http://creativecommons.org/licenses/by-nc-nd/4.0




*Institutions are responsible for keeping their URLs functional (digital file, item page in repository site)